Spiro Remedial Ties

INSTALLATION PROCEDURE

back to Types of Wall Ties

 (view Specification) INSTALLATION PROCEDURE

1.) Drill a 10mm diameter hole through the masonry to a depth of 55mm in the inner leaf. Remove all dust and debris from the hole.
 
2.) Inject a quantity of Resin into the inner leaf hole, via a resin extension tube. Insert the tie into the resin and push firmly home. When the resin has set, a pull test can be undertaken where appropriate. Details of resin setting times are published in the Resin data sheets.
 
3.) To finish the outer leaf, inject the resin into the outer leaf as above until the hole is full.
 
4.) Make good the hole with matching mortar or mastic.
 

 
Availability:
  • Double Resin
  • Standard Lengths
  • Other Lengths
  • Ex Stock - 3/4 days delivery
  • Standard Diameters Available - 10mm

Packing:
  • 200 per box / 1000 per outer box
 

 