| Installation Procedure: |
| 1.) After locating and marking positions of holes on the outer side of the wall. Drill clearance holes (13mm - 16mm diameter depending upon material and length of tie to be used) to specify depth and at required vertical spacing. |
2.)
Blow out holes and thoroughly flush with water. |
3.) With the aid of a resin gun, pump RESIN to outlet of nozzle. Insert the nozzle to full depth of drilled hole and pump resin to fill hole. Maintain pressure on gun while retrieving nozzle to ensure that all voids are filled with resin. |
| 4.) Wind the correct length of RESIN BAR into the hole using Drive-Fix support tool. Make good all holes at the surface with colour matching dyed mortar. |
| Installation Notes: |
| Unless specified otherwise the following criteria are to be used. |
| a.) RESIN BAR to extend at least 100mm past the crack. |
| b.) Normal vertical spacing of RESIN BAR is 450mm (6 brick courses). |
| c.) RESIN BAR to be installed in the centre of the wall. |